Total carbon (production + transport)
784,578
kgCO₂eq
Production 767,297 · Transport 17,281 · A1-A4
22 deliveries · 7 materials · Last updated 2025-12-18
Carbon share by material
Concrete
56.4%
Structural
28.2%
Reinforcing
9.4%
Insulation
2.7%
Bituminous
2.7%
Windows
0.3%
Plasterboard
0.3%
Site delivery history (by material)
Material 1Reinforcing Steel Rebar B500B Ø12mm3 split deliveries · 1 suppliersDelivery total95 tCarbon72,200kgCO₂eq
Material 1
Reinforcing Steel Rebar B500B Ø12mm
3 split deliveries · 1 suppliers
Delivery total
95 t
Carbon72,200kgCO₂eq
06-15 08:00 · 35 t cumulative 35/95 t
Stahlbau Ruhr Essen · Slab cages east · Rebar batch 1 — east slab cages
1/3
06-22 08:00 · 35 t cumulative 70/95 t
Stahlbau Ruhr Essen · Slab cages west · Rebar batch 2 — west slab cages
2/3
07-02 08:00 · 25 t cumulative 95/95 t
Stahlbau Ruhr Essen · Dock-leveler pads · Rebar batch 3 — dock-leveler pads + plinth cages
3/3
Material 2Ready-mix Concrete C30/37 (XC2)5 split deliveries · 1 suppliersDelivery total1,800 m³Carbon432,900kgCO₂eq
Material 2
Ready-mix Concrete C30/37 (XC2)
5 split deliveries · 1 suppliers
Delivery total
1,800 m³
Carbon432,900kgCO₂eq
07-05 07:45 · 380 m³ cumulative 380/1,800 m³
BetonWerk Stuttgart Süd · West slab bay A · Pour event 1/5 — west slab bay A
1/5
07-08 07:45 · 400 m³ cumulative 780/1,800 m³
BetonWerk Stuttgart Süd · West slab bay B · Pour event 2/5 — west slab bay B
2/5
07-12 07:45 · 450 m³ cumulative 1,230/1,800 m³
BetonWerk Stuttgart Süd · East slab bay · Pour event 3/5 — east slab bay (largest pour)
3/5
07-18 07:45 · 380 m³ cumulative 1,610/1,800 m³
BetonWerk Stuttgart Süd · Dock pads + plinth · Pour event 4/5 — dock-leveler pads + column footings
4/5
07-22 07:45 · 190 m³ cumulative 1,800/1,800 m³
BetonWerk Stuttgart Süd · Office wing slab · Pour event 5/5 — office wing slab
5/5
Material 3Structural Steel S355J2 (Hot-rolled Section)5 split deliveries · 1 suppliersDelivery total200 tCarbon216,000kgCO₂eq
Material 3
Structural Steel S355J2 (Hot-rolled Section)
5 split deliveries · 1 suppliers
Delivery total
200 t
Carbon216,000kgCO₂eq
08-04 07:30 · 50 t cumulative 50/200 t
Stahlbau Ruhr Duisburg · East portal frame · Steel batch 1 — east portal frame columns + rafters
1/5
08-12 07:30 · 45 t cumulative 95/200 t
Stahlbau Ruhr Duisburg · East portal frame · Steel batch 2 — east portal frame bracing + purlins
2/5
08-20 07:30 · 40 t cumulative 135/200 t
Stahlbau Ruhr Duisburg · West portal frame · Steel batch 3 — west portal frame columns + rafters
3/5
08-27 07:30 · 40 t cumulative 175/200 t
Stahlbau Ruhr Duisburg · West portal frame · Steel batch 4 — west portal frame bracing + purlins
4/5
09-05 07:30 · 25 t cumulative 200/200 t
Stahlbau Ruhr Duisburg · Office wing + secondary · Steel batch 5 — office wing + secondary steel
5/5
Material 4XPS Insulation Board 50mm4 split deliveries · 1 suppliersDelivery total6,500 m²Carbon20,865kgCO₂eq
Material 4
XPS Insulation Board 50mm
4 split deliveries · 1 suppliers
Delivery total
6,500 m²
Carbon20,865kgCO₂eq
09-15 09:30 · 1700 m² cumulative 1,700/6,500 m²
Insulux Brandenburg · East panel staging · XPS sandwich-panel core batch 1 — east half
1/4
09-22 09:30 · 1700 m² cumulative 3,400/6,500 m²
Insulux Brandenburg · East panel staging · XPS sandwich-panel core batch 2 — east half
2/4
10-05 09:30 · 1700 m² cumulative 5,100/6,500 m²
Insulux Brandenburg · West panel staging · XPS sandwich-panel core batch 3 — west half
3/4
10-12 09:30 · 1400 m² cumulative 6,500/6,500 m²
Insulux Brandenburg · Office wing + west panels · XPS batch 4 — office wing + west completion
4/4
Material 5Bituminous Roofing Membrane SBS 4mm3 split deliveries · 1 suppliersDelivery total4,200 m²Carbon20,790kgCO₂eq
Material 5
Bituminous Roofing Membrane SBS 4mm
3 split deliveries · 1 suppliers
Delivery total
4,200 m²
Carbon20,790kgCO₂eq
10-18 08:30 · 1400 m² cumulative 1,400/4,200 m²
Dachschutz Bau Wiesbaden · Roof east zone · SBS membrane batch 1 — east zone
1/3
10-25 08:30 · 1400 m² cumulative 2,800/4,200 m²
Dachschutz Bau Wiesbaden · Roof central zone · SBS membrane batch 2 — central zone
2/3
11-05 08:30 · 1400 m² cumulative 4,200/4,200 m²
Dachschutz Bau Wiesbaden · Roof west zone · SBS membrane batch 3 — west zone
3/3
Material 6Triple-glazed Window (Uw 0.8)Single deliveryDelivery total45 setCarbon2,358kgCO₂eq
Material 6
Triple-glazed Window (Uw 0.8)
Single delivery
Delivery total
45 set
Carbon2,358kgCO₂eq
11-12 10:00 · 45 set
FensterWerk Bayern · Office wing façade · Triple-glazed units — office wing (45 sets)
Single
Material 7Gypsum Plasterboard 12.5mmSingle deliveryDelivery total1,200 m²Carbon2,184kgCO₂eq
Material 7
Gypsum Plasterboard 12.5mm
Single delivery
Delivery total
1,200 m²
Carbon2,184kgCO₂eq
11-22 13:30 · 1200 m²
PlasterPro Sachsen-Anhalt · Office wing interiors · Plasterboard — office wing partitions
Single
Record verification
Project data anyone can trust
23
Records on file
23
Verified
0
Tampering found
Usable as-is for EU CPR, BREEAM, DGNB and LEED submissions
Source verification hash9cc561da42…46995e02eb
Certifications
DGNB