Stuttgart Vaihingen Logistics Hub
Client Vaihinger Logistik GmbH · Industriestraße 18, 70563 StuttgartCompletedTargeting DGNB Silver
ContractorGoldbeck GmbH
Schedule2025-06-01 ~ 2025-12-15
Building typeIndustrial
Total carbon
784,578kgCO₂eq
As of snapshot 2025-12-15
Site deliveries
22entries
From the moment of QR scan
Materials / suppliers
7types · 7 suppliers
Categorised by delivered material
Quick transport scenarios
for Ready-mix Concrete C30/37 (XC2) · current transport 9,374 kgCO₂eq
Click a chip — savings apply to the delivery row below.
Carbon share by material
784,578
kgCO₂eq
- Concrete56.4%
- Structural28.2%
- Reinforcing9.4%
- Insulation2.7%
- Bituminous2.7%
- Windows0.3%
- Plasterboard0.3%
Cumulative carbon over time
Cumulative carbon adds up with every delivery. Large material shipments cause visible jumps.
Material lifecycle
At-a-glance view of how far the materials in this project have travelled.
STEP 1
Production
EPD-listed material leaves the plant
STEP 2
Transport
Dispatched on the delivery route
STEP 3
Site arrival
QR registered on site
STEP 4
Verification
Verification hash matched
STEP 5
Certification
Submission package ready
Site delivery records
Materials sorted by carbon contribution. Click a row to see step-by-step traceability and a transport simulation.
Material
Progress
Quantity
Carbon
Share of total

Ready-mix Concrete C30/37 (XC2)
1,800 m³
442,274kgCO₂eq
56.4%

Structural Steel S355J2 (Hot-rolled Section)
200 t
220,712kgCO₂eq
28.1%

Reinforcing Steel Rebar B500B Ø12mm
95 t
74,438kgCO₂eq
9.5%

XPS Insulation Board 50mm
6,500 m²
21,246kgCO₂eq
2.7%

Bituminous Roofing Membrane SBS 4mm
4,200 m²
21,030kgCO₂eq
2.7%

Gypsum Plasterboard 12.5mm
1,200 m²
2,490kgCO₂eq
0.3%

Triple-glazed Window (Uw 0.8)
45 set
2,388kgCO₂eq
0.3%