Berlin Mitte Office New Build
Client BauKraft GmbH · Friedrichstraße 100, 10117 BerlinIn constructionTargeting BREEAM Excellent · DGNB Gold · LEED Gold
ContractorStrabag SE
Schedule2026-03-10 ~ In progress
Building typeOffice
Total carbon
1,142,000kgCO₂eq
As of snapshot 2026-04-15
Site deliveries
39entries
From the moment of QR scan
Materials / suppliers
10types · 11 suppliers
Categorised by delivered material
Quick transport scenarios
for Ready-mix Concrete C30/37 (XC2) · current transport 5,446 kgCO₂eq
Click a chip — savings apply to the delivery row below.
Carbon share by material
1,142,000
kgCO₂eq
- Concrete62.7%
- Reinforcing18.6%
- Structural17.6%
- Insulation0.7%
- Lime-Cement0.5%
Cumulative carbon over time
Cumulative carbon adds up with every delivery. Large material shipments cause visible jumps.
Material lifecycle
At-a-glance view of how far the materials in this project have travelled.
STEP 1
Production
EPD-listed material leaves the plant
STEP 2
Transport
Dispatched on the delivery route
STEP 3
Site arrival
QR registered on site
STEP 4
Verification
Verification hash matched
STEP 5
Certification
Submission package ready
Site delivery records
Materials sorted by carbon contribution. Click a row to see step-by-step traceability and a transport simulation.
Material
Progress
Quantity
Carbon
Share of total

Ready-mix Concrete C30/37 (XC2)
2,500 m³
606,696kgCO₂eq
53.1%

Structural Steel S355J2 (Hot-rolled Section)
200 t
222,758kgCO₂eq
19.5%

Reinforcing Steel Rebar B500B Ø12mm
220 t
174,975kgCO₂eq
15.3%

Clay Hollow Brick HLz 1.2/12 (240mm)
1,800 m²
63,742kgCO₂eq
5.6%

Gypsum Plasterboard 12.5mm
12,000 m²
22,817kgCO₂eq
2.0%

Triple-glazed Window (Uw 0.8)
400 set
21,607kgCO₂eq
1.9%

Lime-Cement Mortar M5 (Dry-mix)
110 t
19,514kgCO₂eq
1.7%

XPS Insulation Board 50mm
4,500 m²
14,535kgCO₂eq
1.3%

Bituminous Roofing Membrane SBS 4mm
1,200 m²
6,128kgCO₂eq
0.5%

Engineered Oak Flooring 22mm (3-ply)
600 m²
-10,772kgCO₂eq
-0.9%
Ledger verification
Delivery records
Carbon snapshot
Certifications
BREEAM
DGNB
LEED
Data needed
Regional-material share · Recycled content
Producer adds to the EPD → buildchain syncs automatically. Contractor doesn't need to enter anything.