Frankfurt Messeturm Hotel Tower

Frankfurt Messeturm Hotel Tower

Client RheinHotels Holding AG · Friedrich-Ebert-Anlage 49, 60308 Frankfurt am MainIn constructionTargeting BREEAM Very Good · DGNB Gold · LEED Silver
ContractorEd. Züblin AG
Schedule2026-01-15 ~ In progress
Building typeHospitality
Total carbon
1,378,966kgCO₂eq
Last updated 2026-05-15
Site deliveries
40entries
From the moment of QR scan
Materials / suppliers
9types · 10 suppliers
Categorised by delivered material

Site delivery records

Materials sorted by carbon contribution. Click a row to see step-by-step traceability and a transport simulation.

Material
Progress
Quantity
Carbon
Share of total
Ready-mix Concrete C30/37 (XC2)
Ready-mix Concrete C30/37 (XC2)
Concrete · BetonWerk
3,000
732,839kgCO₂eq
53.1%
Structural Steel S355J2 (Hot-rolled Section)
Structural Steel S355J2 (Hot-rolled Section)
Structural Steel · Stahlbau
380 t
415,112kgCO₂eq
30.1%
Reinforcing Steel Rebar B500B Ø12mm
Reinforcing Steel Rebar B500B Ø12mm
Structural Steel · Stahlbau
180 t
139,367kgCO₂eq
10.1%
Clay Hollow Brick HLz 1.2/12 (240mm)
Clay Hollow Brick HLz 1.2/12 (240mm)
Masonry · Ziegelei
1,200
36,691kgCO₂eq
2.7%
Gypsum Plasterboard 12.5mm
Gypsum Plasterboard 12.5mm
Interior Finish · PlasterPro
16,000
32,158kgCO₂eq
2.3%
Triple-glazed Window (Uw 0.8)
Triple-glazed Window (Uw 0.8)
Windows & Doors · FensterWerk
320 set
17,080kgCO₂eq
1.2%
XPS Insulation Board 50mm
XPS Insulation Board 50mm
Insulation · Insulux
3,800
12,391kgCO₂eq
0.9%
Bituminous Roofing Membrane SBS 4mm
Bituminous Roofing Membrane SBS 4mm
Roofing · Dachschutz
1,800
8,970kgCO₂eq
0.7%
Engineered Oak Flooring 22mm (3-ply)
Engineered Oak Flooring 22mm (3-ply)
Flooring · Parkett
850
-15,642kgCO₂eq
-1.1%
Certifications
BREEAM
Structural frame, concrete, rebar, and façade insulation pre-packaged. Awaiting first formal carbon snapshot.
In review
DGNB
DGNB ENV1.1 base inventory started. Material EPD coverage to be expanded before submission.
Data needed
Regional-material share · Recycled content
Producer adds to the EPD → buildchain syncs automatically. Contractor doesn't need to enter anything.
Needs data
LEED
LEED v4.1 MR credit file not yet started.
Data needed
Regional-material share · Recycled content
Producer adds to the EPD → buildchain syncs automatically. Contractor doesn't need to enter anything.
Needs data