← Certifications

DGNB Gold submission package

In review

Submission package for DGNB e.V.. Download as PDF or jump straight to the submission portal.

3types
Materials included
10entries
Delivery records
33,652
Total carbon (kgCO₂eq)
3.1MB
24-page package
Project metadata
Site addressFriedrichstraße 100, 10117 Berlin
Construction start2026-03-10
ClientBauKraft GmbH
ContractorStrabag SE
Certification targetDGNB Gold
Material EPDs3 types
Delivery records10 entries
DateMaterial / quantitySupplierCarbon
04-23 13:30Gypsum Plasterboard 12.5mm 3000 PlasterPro Sachsen-Anhalt5,704.13 kgCO₂eq
04-25 11:00Triple-glazed Window (Uw 0.8) 80 setFensterWerk Bayern4,321.46 kgCO₂eq
05-07 13:30Gypsum Plasterboard 12.5mm 3000 PlasterPro Sachsen-Anhalt5,704.13 kgCO₂eq
05-13 11:00Triple-glazed Window (Uw 0.8) 80 setFensterWerk Bayern4,321.46 kgCO₂eq
05-15 13:30Gypsum Plasterboard 12.5mm 3000 PlasterPro Sachsen-Anhalt5,704.13 kgCO₂eq
05-19 11:00Triple-glazed Window (Uw 0.8) 80 setFensterWerk Bayern4,321.46 kgCO₂eq
05-21 13:30Gypsum Plasterboard 12.5mm 3000 PlasterPro Sachsen-Anhalt5,704.13 kgCO₂eq
05-23 11:00Triple-glazed Window (Uw 0.8) 80 setFensterWerk Bayern4,321.46 kgCO₂eq
05-28 13:00Engineered Oak Flooring 22mm (3-ply) 600 Parkett Schwarzwald Freiburg-10,771.63 kgCO₂eq
05-30 11:00Triple-glazed Window (Uw 0.8) 80 setFensterWerk Bayern4,321.46 kgCO₂eq
Carbon calculationEN 15804
Production stage (A1-A3)31,640 kgCO₂eq
Transport stage (A4)2,012 kgCO₂eq
Total (A1-A3 + A4)33,652 kgCO₂eq

buildchain currently tracks the production and transport stages automatically. For assessment beyond that — construction, use and end-of-life — please add the required documentation per the certification body's guidance.

Source verification hashes11 entries

Every record in this package is on-chain, so DGNB e.V. can independently verify integrity from the hash alone.

Project carbon snapshot hashe8ca56acc0bdea7d862f9c805b2ad7395ba848745c218855fc011788dbef84d1
Delivery — Gypsum Plasterboard 12.5mm901910a419acabe5ee0a13389013bae14e46a9ecc374f83d8c5a41c0504cfaf9
Delivery — Triple-glazed Window (Uw 0.8)6a16963bdac5f89a9dddd427496c731e51f0b1f38f1f9b422ef8e29f2f043a06
Delivery — Gypsum Plasterboard 12.5mmccbcdadcc784020dc006b43018c52149e58adfa49bd588e5d45dfa3826285fe1
Delivery — Triple-glazed Window (Uw 0.8)0eb076cf8d0281962f2978dbb780ba7af7dd07c7962ab7fe01771e937fbc9b22
Delivery — Gypsum Plasterboard 12.5mm34b2f138cbe934e17f55b7ecfe28023df432ffc0ca8014f95ed87db4a1055c15
Delivery — Triple-glazed Window (Uw 0.8)d709e8b9dbd0d4f49bf6b5d5f897b808fd0e2e514c8a633c5811b12d6f116390
Delivery — Gypsum Plasterboard 12.5mm491157f49884eed58c7b7308cc8d8f51f210163ce98a7a2d7035ce90d2eba669
Delivery — Triple-glazed Window (Uw 0.8)230edd8b599e3b8a3c4f33f785e6478ef5ba1e43b5351d3212d46f6fb1a2e576
Delivery — Engineered Oak Flooring 22mm (3-ply)6f13d25dd76ba220dca7b2191334d714ee660e351ddfd728cd972db1f434675c
Delivery — Triple-glazed Window (Uw 0.8)071dbc01d3066f4c1d58ae5d2dd1f620dfbdee19ef354b14431caa3579576b28