← Certifications
Frankfurt Messeturm Hotel Tower·RheinHotels Holding AG

DGNB Gold submission package

Needs data

Submission package for DGNB e.V.. Download as PDF or jump straight to the submission portal.

2types
Materials included
19entries
Delivery records
1,147,951
Total carbon (kgCO₂eq)
3.7MB
31-page package
Data needed

Two additional producer datapoints are required to submit

LEED v4.1 BD+C Materials & Resources requires regionality and recycled-content data for each material. Once the producer updates their EPD, buildchain ingests and organises the data automatically. The contractor only needs to send a single request.

Contractor (you)
Send a single request to the producer
Producer
Adds the data fields to the EPD
buildchain
Pulls the EPD update into the certification package
Regional Materials
Awaiting producer
Share of materials extracted and manufactured within 160 km of the site. A core LEED MR credit metric.
Request to: Ready-mix Concrete C30/37 (XC2) (BetonWerk Berlin GmbH) · Structural Steel S355J2 (Hot-rolled Section) (Stahlbau Ruhr GmbH)
Recycled Content
Awaiting producer
Pre-consumer / post-consumer recycled feedstock share per material. A standard EPD-declared metric.
Request to: 2 producers (same set)
Project metadata
Site addressFriedrich-Ebert-Anlage 49, 60308 Frankfurt am Main
Construction start2026-01-15
ClientRheinHotels Holding AG
ContractorEd. Züblin AG
Certification targetDGNB Gold
Material EPDs2 types
Delivery records19 entries
DateMaterial / quantitySupplierCarbon
01-26 08:00Structural Steel S355J2 (Hot-rolled Section) 35 tStahlbau Ruhr Duisburg38,234 kgCO₂eq
02-02 07:45Ready-mix Concrete C30/37 (XC2) 380 BetonWerk Frankfurt Ost92,633.97 kgCO₂eq
02-04 07:45Ready-mix Concrete C30/37 (XC2) 360 BetonWerk Frankfurt Ost87,758.5 kgCO₂eq
02-08 08:00Structural Steel S355J2 (Hot-rolled Section) 32 tStahlbau Ruhr Duisburg34,956.8 kgCO₂eq
02-12 07:45Ready-mix Concrete C30/37 (XC2) 320 BetonWerk Frankfurt Ost78,007.55 kgCO₂eq
02-18 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
02-25 07:45Ready-mix Concrete C30/37 (XC2) 380 BetonWerk Frankfurt West92,973.23 kgCO₂eq
03-02 08:00Structural Steel S355J2 (Hot-rolled Section) 35 tStahlbau Ruhr Duisburg38,234 kgCO₂eq
03-12 07:45Ready-mix Concrete C30/37 (XC2) 320 BetonWerk Frankfurt West78,293.25 kgCO₂eq
03-15 08:00Structural Steel S355J2 (Hot-rolled Section) 38 tStahlbau Ruhr Duisburg41,511.2 kgCO₂eq
04-08 07:45Ready-mix Concrete C30/37 (XC2) 240 BetonWerk Frankfurt Ost58,505.66 kgCO₂eq
04-12 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
03-19 07:45Ready-mix Concrete C30/37 (XC2) 360 BetonWerk Frankfurt West88,079.9 kgCO₂eq
03-26 07:45Ready-mix Concrete C30/37 (XC2) 340 BetonWerk Frankfurt West83,186.58 kgCO₂eq
04-01 07:45Ready-mix Concrete C30/37 (XC2) 300 BetonWerk Frankfurt West73,399.92 kgCO₂eq
02-22 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
03-10 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
04-15 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
05-15 08:00Structural Steel S355J2 (Hot-rolled Section) 40 tStahlbau Ruhr Duisburg43,696 kgCO₂eq
Carbon calculationEN 15804
Production stage (A1-A3)1,131,900 kgCO₂eq
Transport stage (A4)16,051 kgCO₂eq
Total (A1-A3 + A4)1,147,951 kgCO₂eq

buildchain currently tracks the production and transport stages automatically. For assessment beyond that — construction, use and end-of-life — please add the required documentation per the certification body's guidance.

Source verification hashes19 entries

Every record in this package is on-chain, so DGNB e.V. can independently verify integrity from the hash alone.

Delivery — Structural Steel S355J2 (Hot-rolled Section)df22c5f7d8f51d8eb61500438446e3320bcf216fa4491b76b34db47b5c8a975a
Delivery — Ready-mix Concrete C30/37 (XC2)fb13e7815f8ce9ccd50b85dddc5b34a021cb51996a48ed94830579b594d611a8
Delivery — Ready-mix Concrete C30/37 (XC2)211661ea9e739d172537c4ee23027c631e2149929e9e4a8fe066d8d6b61ed29b
Delivery — Structural Steel S355J2 (Hot-rolled Section)4718dc53dd5a5062756403ff69a9c4261a77418bd2f3a78a3dc837f7d767938e
Delivery — Ready-mix Concrete C30/37 (XC2)6d1b56bc1c4103adc5904310b0510be916cd3984074904859b299718f8b05481
Delivery — Structural Steel S355J2 (Hot-rolled Section)890c7846a2d8cfebe486c8aa08655d572cc969aecd48d6a36ae15c5230fbcecf
Delivery — Ready-mix Concrete C30/37 (XC2)12f26bd041d732296cfb7044720934c5e7b58bd839029ec11e57638cedc92f1d
Delivery — Structural Steel S355J2 (Hot-rolled Section)eceff16702f07ede1ccf31332b61ed02eb5f93df04ad41c6c0f6046bcc806e2a
Delivery — Ready-mix Concrete C30/37 (XC2)a0eafc95852318487c76b3119e135d7cf2b3a3ed9c0287d00633462989eeec44
Delivery — Structural Steel S355J2 (Hot-rolled Section)7ae8822c463c64fd2c4a7400576c15b9f65dabf467ad2ad5a8d1e70868a62b51
Delivery — Ready-mix Concrete C30/37 (XC2)bcdc1e1f0bbae4869b6d38abf627aeea08afd417620259eed5eb0b63c23a6692
Delivery — Structural Steel S355J2 (Hot-rolled Section)d13a84dbd8569e7aa892f3c7c48d3bfe068cea93810cbf22e7485c3ff420b0e6
Delivery — Ready-mix Concrete C30/37 (XC2)b7c801625011a6ffa9015d26d15d1c8bbecb688a826d0af7e6dfbc8e9e6d4d43
Delivery — Ready-mix Concrete C30/37 (XC2)91c586f9112af3b458d51e158ab5d4c8c27570914e17adfc897e5d6d7d248c50
Delivery — Ready-mix Concrete C30/37 (XC2)03ccf634cddf0d954959db485eabac11b777587ceb17c4eda1a27ad0e0fecf29
Delivery — Structural Steel S355J2 (Hot-rolled Section)ddca7bcb8ef85a4af92d9c371804644ebb216083b6c267f244411bafbfb60e36
Delivery — Structural Steel S355J2 (Hot-rolled Section)7fe5be4e42e20e836b1451f2213479af92d30836f66d66bb4770321a2dd658a7
Delivery — Structural Steel S355J2 (Hot-rolled Section)59e343e503fb5b381ae812e1da8d31ec967d103dc21809c0ea0ed2f90c8d97b4
Delivery — Structural Steel S355J2 (Hot-rolled Section)978303f91a76bab4fb1f631505a073c841cdbd91c618e4fc7367f26db7da1b50