LEED Silver submission package
Needs dataSubmission package for USGBC. Download as PDF or jump straight to the submission portal.
0types
Materials included
0entries
Delivery records
0
Total carbon (kgCO₂eq)
1.2MB
8-page package
Data needed
Two additional producer datapoints are required to submit
LEED v4.1 BD+C Materials & Resources requires regionality and recycled-content data for each material. Once the producer updates their EPD, buildchain ingests and organises the data automatically. The contractor only needs to send a single request.
Contractor (you)
Send a single request to the producer
Producer
Adds the data fields to the EPD
buildchain
Pulls the EPD update into the certification package
Regional Materials
Awaiting producerShare of materials extracted and manufactured within 160 km of the site. A core LEED MR credit metric.
Recycled Content
Awaiting producerPre-consumer / post-consumer recycled feedstock share per material. A standard EPD-declared metric.
Project metadata
| Site address | Friedrich-Ebert-Anlage 49, 60308 Frankfurt am Main |
|---|---|
| Construction start | 2026-01-15 |
| Client | RheinHotels Holding AG |
| Contractor | Ed. Züblin AG |
| Certification target | LEED Silver |
Material EPDs0 types
Delivery records0 entries
| Date | Material / quantity | Supplier | Carbon |
|---|
Carbon calculationEN 15804
| Production stage (A1-A3) | 0 kgCO₂eq |
|---|---|
| Transport stage (A4) | 0 kgCO₂eq |
| Total (A1-A3 + A4) | 0 kgCO₂eq |
buildchain currently tracks the production and transport stages automatically. For assessment beyond that — construction, use and end-of-life — please add the required documentation per the certification body's guidance.
Source verification hashes0 entries
Every record in this package is on-chain, so USGBC can independently verify integrity from the hash alone.