DGNB Bronze submission package
ReadySubmission package for DGNB e.V.. Download as PDF or jump straight to the submission portal.
8types
Materials included
13entries
Delivery records
35,537
Total carbon (kgCO₂eq)
4.9MB
37-page package
Project metadata
| Site address | Mönckebergstraße 25, 20095 Hamburg |
|---|---|
| Construction start | 2025-09-01 |
| Client | Behörde für Schule und Berufsbildung |
| Contractor | Goldbeck GmbH |
| Certification target | DGNB Bronze |
Material EPDs8 types
XPS Insulation Board 50mm
EPDIBU · Valid until 2029-01-01
Per-unit carbon (A1-A3)3.21 kgCO₂eq / m²
Declared unit1 m² (EN 13164)
CEEN 13164EPD
Ready-mix Concrete C30/37 (XC2)
EPDIBU · Valid until 2028-08-15
Per-unit carbon (A1-A3)240.5 kgCO₂eq / m³
Declared unit1 m³ (EN 206)
CEEN 206EPD
Gypsum Plasterboard 12.5mm
EPDIBU · Valid until 2029-04-30
Per-unit carbon (A1-A3)1.82 kgCO₂eq / m²
Declared unit1 m² (EN 520)
CEEN 520EPD
Triple-glazed Window (Uw 0.8)
EPDIBU · Valid until 2028-12-31
Per-unit carbon (A1-A3)52.4 kgCO₂eq / set
Declared unit1 set (EN 14351-1)
CEEN 14351-1EPD
Clay Hollow Brick HLz 1.2/12 (240mm)
EPDIBU · Valid until 2028-11-30
Per-unit carbon (A1-A3)28.4 kgCO₂eq / m²
Declared unit1 m² wall (EN 771-1)
CEEN 771-1EPD
Bituminous Roofing Membrane SBS 4mm
EPDIBU · Valid until 2029-05-31
Per-unit carbon (A1-A3)4.95 kgCO₂eq / m²
Declared unit1 m² (EN 13707)
CEEN 13707EPD
Engineered Oak Flooring 22mm (3-ply)
EPDEPD International · Valid until 2029-04-15
Per-unit carbon (A1-A3)-18.6 kgCO₂eq / m²
Declared unit1 m² (EN 13489)
CEEN 13489EPDFSCPEFC
Lime-Cement Mortar M5 (Dry-mix)
EPDIBU · Valid until 2029-07-31
Per-unit carbon (A1-A3)165 kgCO₂eq / t
Declared unit1 t (EN 998-2)
CEEN 998-2EPD
Delivery records13 entries
| Date | Material / quantity | Supplier | Carbon |
|---|---|---|---|
| 10-08 10:30 | Lime-Cement Mortar M5 (Dry-mix) 9 t | Mörtelwerk Sachsen Dresden | 1,697.04 kgCO₂eq |
| 10-12 09:30 | XPS Insulation Board 50mm 1500 m² | Insulux Hamburg | 4,845 kgCO₂eq |
| 10-22 08:00 | Ready-mix Concrete C30/37 (XC2) 55 m³ | BetonWerk Hamburg | 13,374.81 kgCO₂eq |
| 10-25 08:00 | Ready-mix Concrete C30/37 (XC2) 45 m³ | BetonWerk Hamburg | 10,943.03 kgCO₂eq |
| 11-08 10:30 | Lime-Cement Mortar M5 (Dry-mix) 9 t | Mörtelwerk Sachsen Dresden | 1,697.04 kgCO₂eq |
| 11-15 09:15 | Clay Hollow Brick HLz 1.2/12 (240mm) 320 m² | Ziegelei Rhein Köln | 10,751.58 kgCO₂eq |
| 12-05 08:45 | Bituminous Roofing Membrane SBS 4mm 400 m² | Dachschutz Bau Wiesbaden | 2,037.04 kgCO₂eq |
| 12-15 08:45 | Bituminous Roofing Membrane SBS 4mm 350 m² | Dachschutz Bau Wiesbaden | 1,782.41 kgCO₂eq |
| 01-12 13:20 | Gypsum Plasterboard 12.5mm 1500 m² | PlasterPro Niedersachsen | 2,807.31 kgCO₂eq |
| 01-20 13:20 | Gypsum Plasterboard 12.5mm 1500 m² | PlasterPro Niedersachsen | 2,807.31 kgCO₂eq |
| 02-08 10:45 | Triple-glazed Window (Uw 0.8) 40 set | FensterWerk Bayern | 2,179.7 kgCO₂eq |
| 02-12 10:45 | Triple-glazed Window (Uw 0.8) 40 set | FensterWerk Bayern | 2,179.7 kgCO₂eq |
| 02-20 11:00 | Engineered Oak Flooring 22mm (3-ply) 1200 m² | Parkett Schwarzwald Freiburg | -21,564.84 kgCO₂eq |
Carbon calculationEN 15804
| Production stage (A1-A3) | 31,968 kgCO₂eq |
|---|---|
| Transport stage (A4) | 3,570 kgCO₂eq |
| Total (A1-A3 + A4) | 35,537 kgCO₂eq |
buildchain currently tracks the production and transport stages automatically. For assessment beyond that — construction, use and end-of-life — please add the required documentation per the certification body's guidance.
Source verification hashes14 entries
Every record in this package is on-chain, so DGNB e.V. can independently verify integrity from the hash alone.
Project carbon snapshot hash76c2e7710409d09c95aadf4d8734fff066a66089bf217164e3dcfa25781541f8
Delivery — Lime-Cement Mortar M5 (Dry-mix)f267b2205774e21964376714756ebe35b08ce728b4075db1b6cff75cc399df8d
Delivery — XPS Insulation Board 50mm806042e59ac0c83873b2a9e1a178e6ecbb8aff3d170746c09eabd9f95fbf9cb4
Delivery — Ready-mix Concrete C30/37 (XC2)a662bd4ed9a77b83c3dee8f2e8202eafb7e0f7364b5ca3bbfc0d391a81085da7
Delivery — Ready-mix Concrete C30/37 (XC2)345b4e131cf361a2d35a2bbf142a5766c2df0f4bae5c8ccae3e91bb71d2e1ace
Delivery — Lime-Cement Mortar M5 (Dry-mix)5a5dc87c5bda14ed23866ad05ad19f29bf350744e2b1e9c5414a7ad83e76dbc1
Delivery — Clay Hollow Brick HLz 1.2/12 (240mm)e85659419f25fb0c3301ad9d86dbc7e0ca331f5945b1d2d429265d75da9c98e8
Delivery — Bituminous Roofing Membrane SBS 4mm0e58d3aade0cae57832decaecd830fa3c68917527a072fcf8687bc96fbe559db
Delivery — Bituminous Roofing Membrane SBS 4mm9c51646f2158947692a92f7bf98d385ad1872f67dd0718de6e639f33980b1702
Delivery — Gypsum Plasterboard 12.5mmc253ded8603f47c1e2d56e8c4034801dcddd2760115c75d9cbc4fe54b953d7f5
Delivery — Gypsum Plasterboard 12.5mm8bea85422267409f65c23406d4ef5f2bfe0a4a6af26a9e97d30f216e4d0919e3
Delivery — Triple-glazed Window (Uw 0.8)65e80ad9e3808d541595f4f58e48176801b45271be15419c75adc24d2bc058f0
Delivery — Triple-glazed Window (Uw 0.8)d7ef7a14a034a735061ab228623deeb1f6b63a5c5b15588d8dd1dfb08f9a9bc9
Delivery — Engineered Oak Flooring 22mm (3-ply)b1ecffab614df3eab5ee73171b96a6eefa60426326bffb923070808f6e51dad6