Hamburg Mönckeberg School Refurbishment
Client Behörde für Schule und Berufsbildung · Mönckebergstraße 25, 20095 HamburgCompletedTargeting BREEAM Good · DGNB Bronze
ContractorGoldbeck GmbH
Schedule2025-09-01 ~ 2026-03-15
Building typeEducation
Total carbon
35,537kgCO₂eq
As of snapshot 2026-03-15
Site deliveries
13entries
From the moment of QR scan
Materials / suppliers
8types · 8 suppliers
Categorised by delivered material
Quick transport scenarios
for Ready-mix Concrete C30/37 (XC2) · current transport 268 kgCO₂eq
Click a chip — savings apply to the delivery row below.
Carbon share by material
35,537
kgCO₂eq
- Concrete31.4%
- Engineered29.1%
- Clay11.9%
- Plasterboard7.1%
- Insulation6.3%
- Windows5.5%
- Bituminous4.8%
- Lime-Cement3.9%
Cumulative carbon over time
Cumulative carbon adds up with every delivery. Large material shipments cause visible jumps.
Material lifecycle
At-a-glance view of how far the materials in this project have travelled.
STEP 1
Production
EPD-listed material leaves the plant
STEP 2
Transport
Dispatched on the delivery route
STEP 3
Site arrival
QR registered on site
STEP 4
Verification
Verification hash matched
STEP 5
Certification
Submission package ready
Site delivery records
Materials sorted by carbon contribution. Click a row to see step-by-step traceability and a transport simulation.
Material
Progress
Quantity
Carbon
Share of total

Ready-mix Concrete C30/37 (XC2)
100 m³
24,318kgCO₂eq
68.4%

Clay Hollow Brick HLz 1.2/12 (240mm)
320 m²
10,752kgCO₂eq
30.3%

Gypsum Plasterboard 12.5mm
3,000 m²
5,615kgCO₂eq
15.8%

XPS Insulation Board 50mm
1,500 m²
4,845kgCO₂eq
13.6%

Triple-glazed Window (Uw 0.8)
80 set
4,359kgCO₂eq
12.3%

Bituminous Roofing Membrane SBS 4mm
750 m²
3,819kgCO₂eq
10.7%

Lime-Cement Mortar M5 (Dry-mix)
18 t
3,394kgCO₂eq
9.6%

Engineered Oak Flooring 22mm (3-ply)
1,200 m²
-21,565kgCO₂eq
-60.7%